2025 BMW M Models Competition xDrive at Crews Chevrolet
https://research.crewschevrolet.com/cars/Used/2025/BMW/M+Models/Competition+xDrive/170609762025 BMW M Models Competition xDrive
Selling Price : $79,888
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 33,087
- VIN : WBS33HK07SCS65007
- Stock # : 198627A
- Engine : 3.0L Straight 6 Cylinder Engine
- Transmission : 8-Speed A/T
- Ext. Color : Dravit Grey Metallic
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2dr Car
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
CARFAX 1-Owner, Excellent Condition. Heated Leather Seats, Nav System, Back-Up Camera, All Wheel Drive, Turbo Charged Engine, EXECUTIVE PACKAGE, PARKING ASSISTANCE PACKAGE, DRIVING ASSISTANCE PROFESSIONAL PACKA... M DRIVE PROFESSIONAL
KEY FEATURES INCLUDE
Leather Seats, All Wheel Drive, Heated Driver Seat, Back-Up Camera, Turbocharged Serviced here, Non-Smoker vehicle BMW Competition xDrive with Dravit Grey Metallic exterior and Black interior features a Straight 6 Cylinder Engine with 523 HP at 6250 RPM*.
OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Active Driving Assistant Pro, Extended Traffic Jam Assistant, For limited access highways, EXECUTIVE PACKAGE Remote Engine Start, Power Tailgate, BMW Curved Display w/HUD, Heated Steering Wheel, M DRIVE PROFESSIONAL, PARKING ASSISTANCE PACKAGE Parking Assistant Plus.
A GREAT TIME TO BUY
This M Models is priced $8,300 below J.D. Power Retail.
PURCHASE WITH CONFIDENCE
CARFAX 1-Owner
WHY BUY FROM US
Youve got a friend in the car business
Pricing analysis performed on 4/16/2026. Horsepower calculations based on trim engine configuration. Please confirm the accuracy of the included equipment by calling us prior to purchase.
KEY FEATURES INCLUDE
Leather Seats, All Wheel Drive, Heated Driver Seat, Back-Up Camera, Turbocharged Serviced here, Non-Smoker vehicle BMW Competition xDrive with Dravit Grey Metallic exterior and Black interior features a Straight 6 Cylinder Engine with 523 HP at 6250 RPM*.
OPTION PACKAGES
DRIVING ASSISTANCE PROFESSIONAL PACKAGE Active Driving Assistant Pro, Extended Traffic Jam Assistant, For limited access highways, EXECUTIVE PACKAGE Remote Engine Start, Power Tailgate, BMW Curved Display w/HUD, Heated Steering Wheel, M DRIVE PROFESSIONAL, PARKING ASSISTANCE PACKAGE Parking Assistant Plus.
A GREAT TIME TO BUY
This M Models is priced $8,300 below J.D. Power Retail.
PURCHASE WITH CONFIDENCE
CARFAX 1-Owner
WHY BUY FROM US
Youve got a friend in the car business
Pricing analysis performed on 4/16/2026. Horsepower calculations based on trim engine configuration. Please confirm the accuracy of the included equipment by calling us prior to purchase.
Vehicle Features
- 1MB
- ZDY
- ZPK
- ZPX
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
